18x Stockpile Lighting Towers
Data Capture
57,644
4k images
Used to generate a high-quality, photogrammetric models of 18x lighting towers.
45 min
Average Flight time
Needed to collect all required visual data on a single tower.
55 m
Tower Height
Average tower height
3 days
On Site
Number of days needed to collect all structural data on all 18 towers.


Project Details
Insite was engaged by a structural engineering consultancy to capture and process condition data across 18 high-mast lighting towers at a major coal terminal in Gladstone.
Each tower was inspected using the DJI Matrice 4 series drone, capturing full overage from base to top at high resolution — every connection and structural member documented in detail no EWP inspection could replicate at this scale.
Each tower was delivered as a photogrammetric digital twin, published to an interactive 3D web scene. The client received more than 57,000 4K structural images to build their inspection report.
Insite is extremely proud of the outcomes and value we were able to provide to our client.
Why Insite?
Traditional
Time: 10 Days
Access Equipment: EWP
Labour Required: 3 people
Cost: $60,000.00 +
Data Quality: Phone Images
Data Coverage: Identified defects only
Digital Twins: No
Insite
Time: 3 Days
Access Equipment: No
Labour Required: 1 person
Cost: $20,000.00
Data Quality: 4k Professional Images
Data Coverage: Full asset
Digital Twins: Yes
Comparison
Time Saving: 7 days
Cost Saving: $40,000+
Better Data Quality: Yes
Digital Twins: Yes

